Cane Ridge Subdivision – Phase 2

  • 13.5 Acres
  • 13,715 CY of Excavation & Embankment
  • +/- 2,000 LF of Sewer & Water line
  • 1,931 LF of Drainage
  • 4,840 SY of 8” Pavement w/ Curb

Benjamin Estates Subdivision – Phase 1

  • 15.3 Acres
  • 32,064 CY of Excavation & Embankment
  • +/- 2,900 LF of Sewer & 2,000 LF of Water line
  • New Sewer Lift Station
  • 2,898 LF of Drainage
  • 4,330 SY of 7” Pavement w/ Curb

St. Mary’s Place Subdivision – Phase 1

  • 42 Acres
  • 40,000 CY of Excavation & Embankment
  • +/- 3,700 LF of Water line
  • 1,949 LF of Drainage
  • 11,897 SY of 8” Pavement w/ Curb

South Wastewater Treatment Plant Levee Rehabilitation

  • 11,000 CY of levee capping & reshaping
  • Resurfaced limestone access road
  • Installed 89,000 SF of erosion control concrete mats

City of Thibodaux Sidewalk & Drainage Project

  • Over 400 LF of drainage to fill in an existing roadside ditch
  • 366 SY of sidewalks, driveway aprons and associated work

Terrebonne Council on Aging New Parking Lot

  • Over 200 LF of drainage
  • 3,115 SY of 8” thick limestone
  • Perimeter 6’ tall chain link fence with gates and operators
  • Installed parking bumpers and light pole bases